Which of the following is a project risk?

Study for the ISTQB Foundation Level Exam. Prepare with flashcards, multiple-choice questions, hints, and explanations. Get ready for your certification!

The correct response involves identifying a project risk as a scenario that has the potential to negatively impact project objectives, including timelines, resources, and overall project success. In this case, the development manager's rejection of all defect reports poses a significant risk to the project. It can hinder the team's ability to address existing problems, allocate resources effectively, and maintain quality standards. This situation creates an environment where issues can accumulate, potentially leading to project failure or delays.

The other choices describe issues or defects that have already occurred or are currently affecting the system or testing process. A module with incorrect calculations indicates a defect within the software; a failed performance test indicates problems with meeting performance criteria; and an interface issue relates to existing technical challenges. While these conditions can influence the project's outcomes, they do not represent potential future uncertainties that could derail the project as a whole, which is the defining characteristic of risks.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy